Laserfiche WebLink
<br />F. The State will perform a final project inspection prior to project acceptance <br />as a Quality Control activity. When all project work has been satisfactorily <br />completed, the State will sign the FHWA form 1446C. <br />II. LOCAL AGENCY COMMTIMENTS <br />A. The Local Agency will provide: <br />1. Preliminary engineering, design services, preparation of construction <br />plans, special provisions and estimates in accordance with the <br />State's Roadway and Bridge Design Manuals and Standard Specifi- <br />cations for Road and Bridge Construction. Said plans shall include <br />details of any required detours to prevent any interference of the <br />construction work and to protect the traveling public. <br />2. Design work sheets used in designing of the project. <br />3. Construction plans sealed by a Colorado licensed professional <br />engineer. <br />B. The Local Agency will comply with the following: <br />1. The Local Agency will prepare construction plans in accordance <br />with the requirements of Engineering Services Section 107, Prepara- <br />tion of Construction Plans by Local Agency, attached hereto and <br />made a part hereof. <br />2. The Local Agency will be responsible for the plans being accurate <br />and complete. <br />C. The Local Agency will comply with the applicable provisions of the State's <br />approved Action Plan, including all Federal directives contained therein by <br />reference. <br />D. The Local Agency may enter into a contract with a consultant to do all or <br />any portion of the proposed preliminary engineering and preparation of <br />construction plans. In the event that Federal-aid funds provided herein are <br />to participate in the cost of work to be done by a consultant, the contract <br />shall comply with the requirements of Federal Aid Policy Guide (FAPG), <br />Title 23, Chapter I, Sub-chapter B, Part 172, Administration of Engineering <br /> <br />-4- <br />