My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Planning Commission Minutes 2004 07 13
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
PLANNING COMMISSION
>
2000-2019 Planning Commission
>
2004 Planning Commission Minutes
>
Planning Commission Minutes 2004 07 13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 9:55:15 AM
Creation date
9/10/2014 12:41:59 PM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
Supplemental fields
Test
PCMIN 2004 07 13
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />4.In conjunction with the Final PUD/SRU review, the applicant shall combine the two lots <br />into one legal lot, thus eliminating any question of parking and access agreements for any <br />future uses; <br /> <br />5.A note should be added to the PUD/SRU plans stating that the applicant agrees to <br />equitably participate in the financing and/or construction of Highway 42 public street <br />improvements, including but not limited to lane widening, curb and gutter, sidewalks, <br />bike lanes, streetlights, street signals, street trees and the burying of overhead dry <br />utilities. While it may not be appropriate for this property owner to pay for all of those <br />improvements (half an arterial street standard), we do believe that they should be required <br />to pay their reasonable share; <br /> <br />6.The Final PUD/SRU Site Plan should be modified to reflect a physical barrier to limit <br />vehicular access onto Highway 42 from Cannon Circle to right-in/right-out turning <br />options. The design of this barrier shall be subject to Public Works Department review <br />and approval and shall be constructed at the applicant’s expense; <br /> <br />7.The final PUD/SRU plan submittal should include an updated Final Grading and <br />Drainage Report accommodating the City’s full requirements for on-site storm water <br />detention; <br /> <br />8.A note shall be added to the Final PUD/SRU Site Plan that states, “Drainage facilities <br />shall be maintained by the applicant, including but not limited to detention ponds, outlet <br />structures, piping, etc.”; <br /> <br />9.The applicant shall also be aware that in the future, Cannon Circle Road improvements <br />will be reviewed and improvement costs may be assessed to the property owners who are <br />located along this road frontage; <br /> <br />10.It should be noted on the final PUD plans that the applicant / owner shall be required to <br />complete Cannon Circle public street improvements, as required in the applicant’s <br />previous development agreement with the City. Improvements should be completed no <br />later than the issuance of Certificates of Occupancy for any new or expanded building(s) <br />on the site, subject to Public Works Department plan review and approval, inspection and <br />construction acceptance practices; <br /> <br />11.The applicant / owner shall be required to maintain an operable parking lift system for 10 <br />above grade parking spaces. <br /> <br />Commissioner McAvinew seconded the motion. <br /> <br />Chairman Lipton called for a roll call vote. <br /> <br />Roll Call Vote: <br />Tom McAvinew, Yes; Michael Deborski, Yes; Susan Loo, Yes; Bill McDermott, Yes; Chris <br />Pritchard, Yes; and Jeff Lipton, Yes. Commissioner Kalish was excused. <br /> <br />Motion passed unanimously. <br /> <br />8:55 PM Chairman Lipton declared a 5-minute recess. <br /> <br />9:00 PM Chairman Lipton called the meeting to order. <br /> <br />13 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.