Laserfiche WebLink
corner of existing Cherry Street and future Dogwood Street. The subdivision agreement has been <br />recorded and the civil plans have been approved by the City: One of the recommended conditions <br />of approval would require that Dogwood Street be completed prior to any certificates of occupancy <br />being granted. <br />This application is the first site specific Final PUD application to be reviewed by City Council. <br />The overall Final PUD approval for the Park at CTC applies to this property, as does the <br />Preliminary PUD for the CTC, approved many years ago. As this is the first site to be reviewed <br />in the newly created Park at CTC, Staff and the Planning Commission believe it is important to <br />establish a high standard for approval, consistent with the subdivider's commitments during that <br />approval process. <br />The application is for a 31,378 square foot, single- story building. When presented to the <br />Commission, the proposal also included a Phase Two expansion. Due to Planning Commission <br />concerns, primarily related to the architecture on the expansion, the request before Council is only <br />for the first phase. <br />Applicable building and parking setbacks have been met, including the 60 -foot setback froth <br />Cherry Street that was required because of the combined 40 -foot ditch and utility easements that <br />limit the ability to landscape. Loading and service areas are entirely on the east side of the building <br />and set back quite a distance from the street. Screening from Cherry Street is provided through <br />numerous evergreen trees. <br />Parking is provided for 67 vehicles, a ratio of 2.1 parking spaces Ter 1,000 square feet of gross <br />floor area. This is a fairly typical ratio for industrial users in the CTC and is designed specifically <br />to meet current and estimated future parking needs for this user. It has been noted on the PUD that <br />no individual tenant finish building permits will be issued for proposals that demand more parking <br />than that average ratio. <br />With only the Phase One portion of the proposal moving forward, landscape coverage for the site <br />is very high at 53.8 percent, well above the 25 percent minimum. The Planning Commission <br />resolution for this proposal had many recommended enhancements to the plant materials on the <br />landscape plan. With one minor exception, those conditions have been met. As modified, Staff <br />believes the landscape plan will be an asset to the proposal and provide an appropriate entry <br />statement at a main entry into the subdivision. <br />Staff feels that is important this building set the tone for the architectural intent in the Park, <br />consistent with representation made by the overall subdivider and developer. The building is <br />proposed as primarily a site cast concrete building. Some synthetic stucco is proposed at the main <br />entry at the northwest corner of the building. Generally, the office portion of the building has <br />more interest, including extensive window glazing, and ornamental metal balconies in several <br />locations. The eastern warehouse portion of the building has significantly less interest, but does <br />include some clerestory windows, reveal lines and variation in paint color. <br />10. <br />