Laserfiche WebLink
development to have that access. The only requirement by City Cods <br /> is to have two (2) accesses to this developsitnt, which would be the <br /> two (2) existing accesses on the west side of the devslovment. The <br /> access to South boulder Road provides another cocoas to South <br /> boulder Road, another seam for emerged vehicles, and it lines up <br /> with an *misting intersection, which has a full median cut. He <br /> stated that in regard to the soils end erosion, as of October 1, <br /> 1902, all new dsveloprent is required to submit a store water <br /> aanagenent plan to the Colorado State Health Department. They plan <br /> to fully comply with those requirements. Those requirements are to <br /> provide silt fences and erosion control s•asures, as faros seeding <br /> of the slopes that are disturbed. He explained that there is a <br /> path that is planned that will be constructed by the developer <br /> along Davidson Ditch and will connect to South boulder Road and to <br /> the east to other trails in Louisville. The trail will also <br /> provide *coos* to the neighborhood park that's proposed within the <br /> develop ont. He commented that the walk -out style units being <br /> discussed are an important design for this development. If the <br /> walk -out style's are not allowed, retaining walls will be the only <br /> measure that will be available to allow building in this area. <br /> They teal that with the combination of vegetation and mature <br /> landscaping in the rear of these yards, it otters screening to the <br /> walk -out units. <br /> Davidson called or Council comments and questions. <br /> Lathrop: I used to live in Ri l i sborough Hest, <br /> so he is very familiar with this <br /> site. It hadn't occurred to as her <br /> such dirt you all are planning to <br /> cove. by looking at the cross <br /> sections and the dotted lines that <br /> show the existing contours compared <br /> to what will be, ives two (2) <br /> totally different pictures. The <br /> slopes as we know them now will <br /> change substantially. In many areas <br /> of the existing property the erosion <br /> vill become less of an issue except <br /> for certain areas. The essence of <br /> one of ay questions is the erosion <br /> control s•aoures that will be taken <br /> after the over lotting and prior to <br /> construction, which in some cases <br /> could be up to two (2) years, in <br /> particular on the south side of West <br /> Willow and exactly how that erosion <br /> control measures would be installed <br /> to protect the tolka that would be <br /> using the 'rail that runs down that <br /> .�► draw. <br /> 20 <br />