My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Water Committee Agenda and Packet 2010 10 22
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
UTILITY COMMITTEE (pka: Water Committee)
>
2006-2019 Water Committee Agendas and Packets
>
2010 Water Committee Agendas and Packets
>
Water Committee Agenda and Packet 2010 10 22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 10:46:50 AM
Creation date
10/18/2010 4:11:09 PM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
Supplemental fields
Test
WCPKT 2010 10 22
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City Council Water Committee <br />Meeting Minutes <br />Friday, October 8, 2010 <br />Page 2 of 3 <br /> <br />water right may be a reasonable means of funding the purchase of more <br />functional water rights. <br />VII. Legal <br /> Mr. Hill provided a brief summary of the Marshall Lake and South Boulder & <br />Coal Creek Ditch transfer case to date. As is typical with Water Court Cases, <br />obtaining responses from Objecting Parties is slow, other priorities. This can be <br />sped up with re- <br />additional costs. If the water is needed prior to obtaining a Decree, the State <br />Engineers Office has a procedure which allows the water to be temporarily <br />used under a Substitute Water Supply Plan. Staff will continue discussing the <br />Case with Objectors and review progress to determine if it would be <br />ases are <br />following a similar slow path. <br />VIII. Utility Enterprise Funding <br />Mr. Mathes presented two charts showing the general decline in demands over <br />several years. The first chart showed annual water demands at the treatment <br />plants along with population. Since a peak in 2000 the annual demand has <br />dropped off significantly even with a modest increase in population. The <br />second chart shows the gallons-per-capita-per-day (gpcd) usage over time. <br />While individual years can vary widely a running 5-year average of gpcd shows <br />decline in demands include: 2002 drought shadow, conservation, rate <br />structure, mature landscaping, economic factors, and weather. <br />Mr. Watson presented a financial overview of the combined and individual <br />Utility Enterprise Funds (water/wastewater/storm water). The three utilities <br />operate as a single Enterprise with individual funds used to track <br />revenue/expenditures. Under existing assumptions, the Water Fund could see <br />a deficit in 2011, while the Wastewater and Storm-water funds retain strong <br />reserves. A discussion ensued on the effects of the decline in demands on <br />revenues, projected expenditures (5-years), expenditures beyond the 5-year <br />CIP process, current rates and user fees, and how to address these items for <br />the long term. It was suggested that a Facilities Plan coupled or followed by a <br />Rate Study could be a method for determining and budgeting for the long range <br />needs of the water utility (further discussion below). <br />Mr. Watson continued his presentation showing more detailed data on revenue <br />(user fees, tap fees) and expenditures (operational, capital) trends. Based on <br />existing assumptions, three charts showed the relative effects of percentage <br />increases in user fees on combined fund reserves. The presentation lead to a <br />discussion that suggested that a longer timeline (10-20 years), in regards to <br />larger capital expenditures and funding, may be necessary to more effectively <br />manage the long range needs of the Utility Enterprise in a cost effective <br />manner. Long term planning for user fees (rates) is also important. Such <br />planning allows for the accumulation of needed funds over time at a <br />sustainable rate as opposed to abrupt rate increases to cover large capital <br />outlays. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.