My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Minutes 1999 01 05
PORTAL
>
CITY COUNCIL RECORDS
>
MINUTES (45.090)
>
1970-1999 City Council Minutes
>
1999 City Council Minutes
>
City Council Minutes 1999 01 05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 2:36:44 PM
Creation date
2/3/2004 9:54:23 AM
Metadata
Fields
Template:
City Council Records
Doc Type
City Council Minutes
Signed Date
1/5/1999
Original Hardcopy Storage
2E4
Supplemental fields
Test
CCMIN 1999 01 05
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Howard asked Johnston whether Centrobe accepted the four conditions of approval from the Planning <br />Commission. <br /> <br />Johnston replied that they would like the sign to be constructed with the proposed materials and that the <br />face not be recessed into the sign cabinet. He stated they accept all other conditions. <br /> <br />Howard moved that Council approve Resolution No. 2, Series 1999 -A Resolution Approving An <br />Amended Final PUD Development Plan for a Modified Sign Package for Centrobe, (formerly Neodata), <br />833 West South Boulder Road with the following amendments: <br /> <br />That a survey shall be performed by a state licensed professional land surveyor to ensure <br />that the monument sign approved through this Final PUD Amendment does not encroach <br />any easement; <br /> <br />o <br /> <br />That existing mature landscaping is not adversely affected by the placement of said <br />approved sign, subject to staff review; <br /> <br />° <br /> <br />That if the required landscaping is not installed by may 15, 1999, this PUD shall be called <br />back for review before Planning Commission pursuant to subsection 17.28.220 (A)and <br />that a performance guarantee consistent with City Code and City policies shall be held <br />until such time as the required landscaping is complete. <br /> <br />The motion was seconded by Lathrop. <br /> <br />Sam Light, City Attorney, offered a friendly amendment to the second line in the last 'whereas' clause <br />that the phrase "the Final PUD Development Plan" should be "the Amended Final PUD Development <br />Plan." <br /> <br />Amendment was accepted by Howard and Lathrop. Roll call was taken. Motion passed by a 7-0 vote. <br /> <br />RESOLUTION No. 3, SERIES 1999 - A RESOLUTION APPROVING A FINAL PUD <br />DEVELOPMENT PLAN FOR AN OFFICE AND PLUMBING SUPPLY WAREHOUSE FOR <br />SANDERS PLUMBING, LOT 11, BLOCK 1, CTC, 1st FILING <br /> <br />Davidson called for staff presentation. <br /> <br />Paul Wood, Planning Director, stated that the applicant, Sanders Plumbing, proposes to open a plumbing <br />supply warehouse facility. The facility would primarily be warehouse space for the storage and <br />distribution of plumbing supplies. A small amount of office space is proposed at the far east end of the <br />building, closest to the street. <br /> <br />The site is irregularly shaped due to the curved railroad easement along the south property line. The <br />southwest comer of the site is particularly awkward to develop because of its shape and is proposed as a <br />grass, storm water detention pond area. The building is located in the northern portion of the site, with <br /> <br />10 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.