My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 1976-507
PORTAL
>
CITY COUNCIL RECORDS
>
ORDINANCES (45.120)
>
1948-1989 Ordinances
>
1976 Ordinances
>
Ordinance 1976-507
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2021 11:41:02 AM
Creation date
8/15/2007 11:52:16 AM
Metadata
Fields
Template:
City Council Records
Also Known As (aka)
Amends Various Rezoning Ordinances due to Geologic Hazard Areas and Child Care Facilities
Doc Type
Ordinance
Signed Date
12/21/1976
Ord/Res - Year
1976
Ord/Res - Number
507
Original Hardcopy Storage
7E1
Supplemental fields
Test
ORD 1976-507
Document Relationships
Ordinance 1973-424
(Cross-References)
Path:
\CITY COUNCIL RECORDS\ORDINANCES (45.120)\1948-1989 Ordinances\1973 Ordinances
Ordinance 1975-485
(Cross-References)
Path:
\CITY COUNCIL RECORDS\ORDINANCES (45.120)\1948-1989 Ordinances\1975 Ordinances
Ordinance 1976-501
(Cross-References)
Path:
\CITY COUNCIL RECORDS\ORDINANCES (45.120)\1948-1989 Ordinances\1976 Ordinances
Ordinance 1976-502
(Cross-References)
Path:
\CITY COUNCIL RECORDS\ORDINANCES (45.120)\1948-1989 Ordinances\1976 Ordinances
Resolution 1976-16
(Cross-References)
Path:
\CITY COUNCIL RECORDS\RESOLUTIONS (45.160)\1950-1999 Resolutions\1976 Resolutions
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />(B) If the finding of said investigation is that the site is <br />subject to geologic hazard, but that corrective engineering and <br />engineered construction can be accomplished to minimize significant <br />hazard to public health and safety or to property due to such geo- <br />logic hazard, approval of the final development plan shall be con- <br />di tional and shall be cont:ingent on the issuance of a building permit <br />as specified in Section 13-111 for corrective eingeering and <br />engineered construction. <br /> <br />(C) If the finding of said investigation is that the site cannot <br />be developed for the structure/activity proposed due to geologic <br />hazard, the final development plan or building permit shall be denied. <br /> <br />Section 13-111. Corrective Engineering and Engineered Construction <br /> <br />The following shall pertain to any construction project proposed in <br />an identified or designated geologic hazard area (any undermined area) <br />which requires corrective engineering and engineered construction to <br />minimize significant hazard to public health and safety or to pro- <br />perty due to geologic hazard. The certified site specific reports <br />and plans required by this Section shall be prepared by each <br />engineer and geologist as applicable to their area of sepcialty. <br /> <br />(A) Certification and City approval or reports, designs and actual <br />(as built) construction shall be required to ensure that: <br /> <br />(1) Adequate base data, including engineering <br />geology, hydrology and soils engineering <br />have been provided, and <br /> <br />(2) Said base data is utilized in the design and <br />planning of the proposed project, and <br /> <br />(3) Designs and construction procedures derived <br />from said base data are executed, and <br /> <br />(4) Designs and construction will minimize signifi- <br />cant hazard to public health and safety or to property <br />due to geologic hazard. <br /> <br />(B) The following certified site specific reports and plans <br />shall be submitted to, and approved by, the City Engineer or his <br />authorized representative prior to the issuance of a building permit. <br /> <br />(1) Engineering geology report including an <br />adequate description of the site, conclu- <br />sions regarding the effect of geologic <br />conditions on the proposed project, and <br />recommendations as to the design criteria <br />for corrective measures when necessary. <br /> <br />(2) Soils engineering report including an <br />adequate description of the nature, dis- <br />tribution and strength of existing soils <br />of the site, conclusions regarding the effect <br />of soil conditions on the proposed project, <br />and recommendations as to design criteria for <br />corrective measures when necessary. <br /> <br />(3) Other reports and recommendations as <br />necessary pertaining to hydrology, slope <br />or other relevant factors to be filed as <br />separate reports or included in the <br />above noted reports. <br /> <br />5. <br />
The URL can be used to link to this page
Your browser does not support the video tag.